CLAYTON Residency (1B + G + 3P+ 19 + Gym) on Plot No. BB.B03.04 @ Business Bay, Dubai, UAE.

CLAYTON Residency (1B + G + 3P+ 19 + Gym) on Plot No. BB.B03.04 @ Business Bay, Dubai, UAE.

Client: M/s. Deyaar Properties

MEP Consultant: M/s Arab Experts

Main Contractor: M/s. Engineering Contracting Co. LLC

M/s Afaq Al Taqa Technical Services LLC / City Spectrum LLC – MEP Division  worked in this project under the patronage of MEP contractor

 

COMPLETE MEP SERVICES:

BUILT UP AREA 33, 000 m2

 

  • 02 No’s of transformers with total connected load 1700 kw
  • 01 No’s of stand by generator with 350 KVA capacity
  • Fully integrated fire alarm system (with 02 panels )and BMS
  • Full low current systems (access control system, CCTV system, gate barrier, audio intercom system, lighting control system…etc.
  • Central battery system with 02 panels
  • Aircraft warning light system (medium intensity)
  • GSM system and structured cabling system
  • Lightning protection and earthing system
  • LPG system
  • Firefighting protection system including sprinklers, fire hose cabinet, FM200 system, pre action system for lift machine room and foam system for generator room.
  • 700 RT District cooling system including heat exchanger, variable frequency secondary chilled water pumps, 400 fan coil units, fresh air handling units, chemical treatment system for chilled water network.
  • GRP water tank ,transfer pump, booster pump , sanitary ware and bathroom accessories
    • CLAYTON Residency